|










|
|
Our Process
|
 |
 Step: 1 A pattern of
1 inch diameter holes are drilled through the sunken slab. |
 Step: 2 A limestone slurry is pumped under the slab. Once the void is filled, the slurry becomes pressurized and hydraulically raises the slab to the desired height. |
 Step: 3 The holes are then patched with cement. |
|
© COPYRIGHT 2004 ALL RIGHTS RESERVED A AND B CONCRETE LEVELING, LLC Site developed by Custom Business Solutions |
 |